Installing An Elevator or Wheelchair Lift In Your Home?
https://medium.com/@rpenn123/looking-to-install-a-residential-elevator-292332b7dbf8
Make sure your Builder/Contractor is aware of the following information!
GENERAL REQUIREMENTS
Hoistway
The hoistway must be designed and built in accordance with the “safety standard for platform lifts and stairway chairlifts” or the “safety code for elevators and escalators” and all state and local codes.
The hoistway must be designed and built in accordance with the “safety standard for platform lifts and stairway chairlifts” or the “safety code for elevators and escalators” and all state and local codes.
Plumb Runway
Due to close running clearances, the hoistway and the pit (where provided) are level, plumb and square and are in accordance with the dimensions on the installation drawings.
Due to close running clearances, the hoistway and the pit (where provided) are level, plumb and square and are in accordance with the dimensions on the installation drawings.
Minimum Overhead Clearance
Ensure the minimum overhead clearance is in compliance with codes.
Ensure the minimum overhead clearance is in compliance with codes.
Construction Site
Builder/Contractor is required to provide all masonry, carpentry and drywall work as required and shall patch and make good (including finish painting) all areas where walls/floors may need to be cut, drilled or altered in any way to permit the proper installation of the lift.
Builder/Contractor is required to provide all masonry, carpentry and drywall work as required and shall patch and make good (including finish painting) all areas where walls/floors may need to be cut, drilled or altered in any way to permit the proper installation of the lift.
Dimensions
The contractor/customer is required to verify all dimensions and report any discrepancies to the lift manufacturer immediately.
The contractor/customer is required to verify all dimensions and report any discrepancies to the lift manufacturer immediately.
STRUCTURAL REQUIREMENTS
Floor/Support Wall Loads
The structural engineer is to ensure that the building and shaft will safely support all loads imposed by the lift equipment. Refer to the installation drawings for the loads imposed by the equipment.
The structural engineer is to ensure that the building and shaft will safely support all loads imposed by the lift equipment. Refer to the installation drawings for the loads imposed by the equipment.
Mast to be Securely Fastened
Where required, the mast must be securely fastened to the structural support wall. Refer to the installation drawings for the loads imposed by the equipment.
Where required, the mast must be securely fastened to the structural support wall. Refer to the installation drawings for the loads imposed by the equipment.
Where Doors are Required
Suitable lintels must be provided by the contractor. Door frames are not designed to support overhead wall loads.
Suitable lintels must be provided by the contractor. Door frames are not designed to support overhead wall loads.
ELECTRICAL REQUIREMENTS
General
Electrical equipment and wiring must comply with Section 620 of NEC ANSI NFPA 70.
Electrical equipment and wiring must comply with Section 620 of NEC ANSI NFPA 70.
Power Supply
A 120 VAC, 20A, 60 Hz, single-phase circuit through a fused disconnect with an auxiliary contact on the main power supply is required.
A 120 VAC, 20A, 60 Hz, single-phase circuit through a fused disconnect with an auxiliary contact on the main power supply is required.
Lighting
Lighting of 100 lux minimum is required at platforms and landings. Lighting with a switch and electrical GFCI outlet is required in the hoistway pit.
Lighting of 100 lux minimum is required at platforms and landings. Lighting with a switch and electrical GFCI outlet is required in the hoistway pit.
ENTRANCE REQUIREMENTS
Upper Landing Gates
Where required, smooth solid barriers are to be supplied and installed on both sides of the entrance at the upper level and must be a minimum of 42” (1067 mm) high. The entrance assembly must be in place prior to this provision.
Where required, smooth solid barriers are to be supplied and installed on both sides of the entrance at the upper level and must be a minimum of 42” (1067 mm) high. The entrance assembly must be in place prior to this provision.
Fascia Panel Below Upper Level Entrance
Where required, fascia panel must be fastened to a solid wall and be perpendicular to the floor and walls. Hoistway fascia is not self-supporting for long, continuous runs void of entrances. Adequate support for the fascia must be provided.
Where required, fascia panel must be fastened to a solid wall and be perpendicular to the floor and walls. Hoistway fascia is not self-supporting for long, continuous runs void of entrances. Adequate support for the fascia must be provided.
Entrance Assemblies
Entrance assemblies must be adjusted to align with the platform and interlock equipment. Others must allow an adequate opening.
Entrance assemblies must be adjusted to align with the platform and interlock equipment. Others must allow an adequate opening.
Return Walls
Return walls at the entrances must be built-in by others after the entrance assemblies are in place. The entrance assembly must be securely fastened to the walls by the contractor.
Return walls at the entrances must be built-in by others after the entrance assemblies are in place. The entrance assembly must be securely fastened to the walls by the contractor.